login
(605) 338-6668

Wastewater Treatment Facility


This project involved the construction of a wastewater treatment facility utilizing aeration and tertiary cells.  The construction included modifications to the existing operation building plus the addition of a bar screen, 2-10” force mains and a blower building.  The 60-acre pond site required extensive grading and the placement of a fine bubbler diffuser aeration system.  The completed project resulted in a virtually maintenance free system.

View Related Projects:
Engineering, Wastewater System Design