Hartford Wastewater Treatment Facility
Hartford, South Dakota
Owner
City of Hartford
Project Description
This project involved the construction of a wastewater treatment facility utilizing aeration and tertiary cells. The construction included modifications to the existing operation building plus the addition of a bar screen, 2-10” force mains and a blower building. The 60-acre pond site required extensive grading and the placement of a fine bubbler diffuser aeration system. The completed project resulted in a virtually maintenance free system.
Engineering Staff
- Jon Brown, PM/Designer
- Jason Reaves, Inspector
- Pam Kruger, Technician
- Randy Schoellerman, Surveyor
|
|